Fabrication & Facility Projects

Providing state-of-the-art tools and technologies to ensure your job meets all current safety requirements while delivering superior results at an affordable price.

Job History

Fabrication & Facility Projects We’ve Done

PC4 FLUSH ENHANCEMENT PROJECT

The following (7) tasks represent the work included in this project which includes (24″ Explorer Delivery Line), (24″ Explorer Return Line), (14″ Galena Flush Tie In), (Explorer Facility Connection), (Nitrogen Tank Removal), (Cut & Cap 24″ Tie Into Colonial Gas Line), (Cut & Cap 24″ Tie In to Colonial Distillate Line), all of which includes installation of various lengths of 24″ piping, 14″ ball valves, and associated piping and tie ins.

P66 CONNECTION PROJECT

This Project includes the installation of 12-inch tie-in spool approximately 23 feet in total length and support of local operations for drain up of the line in accordance with the PC4 Enhancement.

MILL SPRINGS PROJECT

Fabrication & installation of Station site made up of 12″, 20″, and 24″ piping, including site prep and grading, civil work and pipe supports, fencing, and grounding.

DUKE SIMPLE CYCLE PROJECT

Gas conditioning, metering, and regulator station install.

HWY 221 STATION PROJECT

Fabricate and install 12″ Launcher & Receiver Station including all civil, fencing, grounding, and CP/AC mitigation components.

DUKE SKYLAND M&R STATION PROJECT

Fabricate and install 20″ .375 wall pipe Launcher & Receiver Meter Station, including all civil, electrical, fencing, and grounding components.