Integrity Projects

B&G Pipeline can maintain the integrity of your industrial and commercial piping systems with comprehensive solutions and assess your pipelines for any damage or degradation.

Job History

Integrity Projects We’ve Done

DURHAM / RALEIGH DIVISION INTEGRITY PROJECT

Miscellaneous Integrity Repairs, Relocates, new pipeline sections including conventional bores, HDDs, etc., and Take-ups / Relay Work.

RALEIGH DIVISION INTEGRITY PROJECT

Miscellaneous Integrity Repairs, Relocates, and Take-ups/ Relays

STATION 30 PSV INSTALLATION PROJECT

The project consists of removing an existing Scrubber System & replace it with a fabricated spool piece.

8” JOHNSONVILLE INTEGRITY DIGS

Excavate an 8″ Johnsonville line located near Johnsonville, SC in 12 locations that will include 3 blowdowns, 2 stopple fittings upstream, and 2 stopples downstream.  This project consists of  3 known 8″ cutouts that will be replaced with pipe we will need to pre-test and install.

ENLINK CONNECTION PROJECT

1 T&M Crew provided the installation of a tap fitting on a on a 6‐inch pipeline inside of an existing facility.  The tap will have a vertical riser with a valve on the end installed for future use located in Ascension Parish, LA.

SC9 ANODE BED INSTALLATION PROJECT

Install 3 anode beds within 3 separate locations located in Longs, SC.  We have to excavate an approx. 12″ wide ditch to lay the wire down into and then the anode at each location.  We also must install a prefabricated sign in quick create at the edge of the river crossing next to these locations.

ASHEVILLE DIVISION INTEGRITY PROJECT

Miscellaneous Integrity Repairs, Relocates, and Take-ups/ Relays

MOV7295 REPLACEMENT PROJECT

Replace the 14″ MOV 7295 at the PC4 Facility during the scheduled outage located at Harris County, TX.

MOV186 REPLACEMENT PROJECT

Remove & replace the MOV-186 located in Harris County, TX.

GASTONIA DIVISION INTEGRITY PROJECT

Miscellaneous Integrity Repairs, Relocates, and Take-ups/ Relays

Have a Project in Mind?

Let’s Get Building!